A moulding cools from the outside in. Any local thickening keeps a molten core longer than its surroundings, and when that core finally shrinks it pulls the visible surface in behind it — that is a sink mark. Which is why nearly every rule here is a ratio to the nominal wall rather than an absolute size.
A rib is not a way to add material — it is a way to add stiffness without adding material. If your rib is over about 60% of the wall you have made a thick section, and the fix is a taller or a second rib, never a fatter one. Bosses follow the same logic: core them out and support them with gussets rather than thickening the base. Ribs above 3× wall height want a cross-rib; free-standing bosses want tying back to a wall.
Design guidance from manufacturer manuals, expressed as ratios to the nominal wall. Moulding outcomes depend on resin, tooling, gate location and process, so treat these as the starting point a moulder will refine. A helper, not a substitute for engineering judgment.